The Xike-South Tong’an BRT section will begin construction on Mach 28. It belongs to the Phase II project of Xiamen Bus Rapid Transit (BRT), according to the operator of Xiamen BRT.
The Xike-South Tong’an section, which is 11.9 kilometers long, is the extension of the BRT Line Two. It starts from the Xike BRT station, runs along the
When it is completed, the BRT Line Two will connect the No.1 Port, Xiamen Railway Station, Tong’an Industrial District, and Tong’an downtown areas in one line. It will be more convenient for the general public inside and outside the
The section is scheduled to be put into use by the end of this year.
With an investment of over 1.5 billion RMB, the Phase II project of Xiamen BRT has a total length of 76.5 km including 4 bus lines and 3 interchange stations.
The 4 bus lines are:
1). The extension of BRT Line One (
2). The Tong’an Line (Xike to South Tong’an), the total length is 11.9 km.
3). The Huandao Avenue Line (He’ping Port to
4). The Cheng’gong Avenue Line (
Content and photo from: www.whatsonxiamen.com
Warning:The use of any news and articles published on eChinacities.com without written permission from eChinacities.com constitutes copyright infringement, and legal action can be taken.
Keywords: Event Event
All comments are subject to moderation by eChinacities.com staff. Because we wish to encourage healthy and productive dialogue we ask that all comments remain polite, free of profanity or name calling, and relevant to the original post and subsequent discussion. Comments will not be deleted because of the viewpoints they express, only if the mode of expression itself is inappropriate.
Please login to add a comment. Click here to login immediately.