The building of a railway linking
The railway starts from
Upon its completion in 2011, the railway will allow trains to travel at a speed of 200 kilometers per hour, and a journey between the two cities will take about three hours compared with the current 11 hours.
The rail link is designed to transport 12 million tons of cargo a year and accommodate 120 pairs of trains per day.
The 41.7-billion-yuan (5.6 billion U.S. dollars) project is co-funded by the Ministry of Railways, and the
The new line will be another important section of
The bridge has 4 lanes and they flow both ways, the bridge’s maximum speed limit is 30kms/hour. There are also sidewalks of 2.5 meters wide set for pedestrians and bicycles on both sides.
With the opening of Huming Bridge, time taken in driving from Huming Road to Hubin Bei Road can be reduced by about 10-15 minutes.
Warning:The use of any news and articles published on eChinacities.com without written permission from eChinacities.com constitutes copyright infringement, and legal action can be taken.
Keywords: Event Event
All comments are subject to moderation by eChinacities.com staff. Because we wish to encourage healthy and productive dialogue we ask that all comments remain polite, free of profanity or name calling, and relevant to the original post and subsequent discussion. Comments will not be deleted because of the viewpoints they express, only if the mode of expression itself is inappropriate.
Please login to add a comment. Click here to login immediately.